Ukrainian Strike on Crimean Bridge Targets Key Structural Load Points
Ukrainian forces struck the Crimean Bridge on November 16-17, 2026, causing serious structural damage, including the melting of metal in the upper arch section and a six-degree vertical deviation. The operation was conducted exclusively with Ukrainian-made weapons. Experts stated that the strikes targeted areas of the bridge bearing the main structural loads. Six impacts caused the structure to lose vertical alignment, and a special warhead burned through metal in the upper arch, compromising its designed curvature. The bridge connects Russia to occupied Crimea across the Kerch Strait. The Security Service of Ukraine reported the destruction of one metal arch and the road span, with the railway section also damaged. Traffic was temporarily halted, and Russia confirmed the damage. This marked the fourth Ukrainian operation against the bridge.