Robot starts retrieving melted fuel at Fukushima plant

9news.com

A robot began a two-week mission on September 11, 2024, to retrieve melted fuel debris from Fukushima's Unit 2 reactor, marking the first attempt to collect this material since the 2011 disaster. An estimated 880 tons of molten fuel remains across three reactors. The decommissioning process is expected to take 30-100 years, with challenges including high radiation levels and complex debris conditions.


With a significance score of 5.4, this news ranks in the top 1% of today's 23427 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 9500 minimalists.