Nelson Hospital staff report unbearable working conditions as rebuild plans shift

odt.co.nz

Workers at Nelson Hospital report unbearable conditions, with temperatures exceeding 30°C and mouldy window sills. Staff describe extreme discomfort, leading some to leave their jobs. A full rebuild plan has shifted to smaller buildings, retaining some existing structures. Previously approved plans for a complete rebuild have changed. The new proposal includes several smaller buildings instead. Complaints about the hospital's infrastructure have been ongoing, with staff expressing frustration over inadequate responses from management. Te Whatu Ora acknowledges complaints about air conditioning and window issues. They state that upgrades are planned alongside seismic strengthening. A detailed business case for the hospital's redevelopment is expected to be presented to ministers in early 2025.


With a significance score of 3.3, this news ranks in the top 9.3% of today's 31272 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 10,000+ subscribers: