Mangaluru–Madgaon Vande Bharat makes final run; new Bengaluru service starts Sunday

thehindu.com [$] —

The Mangaluru Central–Madgaon–Mangaluru Central Vande Bharat Express, Train No. 20646/645, made its final run on Saturday, November 14, 2026, ending the service. The train is being replaced by the new Yeshwantpur–Mangaluru Junction–Madgaon–Yeshwantpur Vande Bharat Express, which begins operation on Sunday. The new service, Train No. 26655/656, was inaugurated remotely by Prime Minister Narendra Modi from Bengaluru and flagged off by Railway Minister Ashwini Vaishnaw from Mangaluru Junction on Friday. The original Mangaluru–Madgaon service, launched on December 30, 2023, had low occupancy, never exceeding 50%, and faced demands for extension to Mumbai that were not fulfilled. The old train operated with halts at Udupi and Karwar, departing Mangaluru at 8:30 a.m. and Madgaon at 6:10 p.m. The service was sanctioned due to efforts by former MP Nalin Kumar Kateel. Railway electrification of the Sakleshpur–Subrahmanya Road section in December 2025 prompted the extension to Bengaluru.


With a significance score of 0.8, this news ranks in the top 87% of today's 29959 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 10,000+ subscribers: