Maglev Shinkansen costs rise to ¥11 trillion due to construction challenges

japantimes.co.jp

Maglev Shinkansen costs are now projected to reach ¥11 trillion, nearly double the initial estimate. This second cost revision by JR Central is due to soaring prices and difficult construction, particularly in mountain tunnels. The Chuo Shinkansen line, connecting Tokyo and Nagoya, previously had its estimate revised to ¥7.04 trillion in 2021.


With a significance score of 2, this news ranks in the top 22% of today's 29960 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 10,000+ subscribers: