Clarendon Hills Faces Opposition to $1.9M No-Bid Downtown Project

patch.com —

Clarendon Hills officials are advancing a $1.9 million no-bid downtown improvement project, drawing opposition from residents. The proposal follows a board rejection two months ago of a nearly $3.3 million no-bid plan, which a trustee called "too spendy." The new contract would go to Rosemont-based Christopher Burke Engineering, with removed items including street pavers and light poles. The plan retains removable bollards for a "flexible gathering space" at the Sloan Triangle on Prospect Avenue, a controversial element opposed by residents citing traffic concerns. Village officials defend the no-bid approach, citing the firm's track record of quality work. Opponent Angela Sartori calls the plan "rushed" with no safety proof, referencing last year's pilot test that caused traffic backups and vehicles stuck on railroad tracks. The board votes Monday.


With a significance score of 1, this news ranks in the top 67% of today's 32742 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 10,000+ subscribers:


Clarendon Hills Faces Opposition to $1.9M No-Bid Downtown Project | News Minimalist