Caltrans Extends 15 Freeway Lane Closures in Temecula Through December 4

patch.com —

Caltrans construction on the 15 Freeway in Temecula will cause overnight lane closures through December 4, with work scheduled from 10 p.m. to 6 a.m. Monday through Friday. The $33.8 million Temecula Auxiliary Lanes and Safety Project includes setting up K-rail barriers and installing an overhead sign on northbound Interstate 15. Motorists between Rancho California Road and Winchester Road should expect lane, auxiliary lane, and shoulder closures as needed. The project adds three auxiliary lane connections to improve traffic flow along the corridor. Drivers are advised to plan ahead, allow extra travel time, and use caution in the work zone.


With a significance score of 0.7, this news ranks in the top 95% of today's 29902 analyzed articles.

Get summaries of news with significance over 5.5 (usually ~10 stories per week). Read by 10,000+ subscribers:


Caltrans Extends 15 Freeway Lane Closures in Temecula Through December 4 | News Minimalist